

(€20.30 Tax Included )
Drill the tank according to the template:
One part of the split pad should be inserted in the hole ф40 in the tank. In order to protect the pad from falling into the tank, the cord should be passed
through one of the holes.
The split pad inside the tank should be screwed with the M3 screw to the fastening ring, keeping in mind the seal between the ring fastening and the plane of the tank.
Take out the cord and fasten the other two M3 screws. The other part of the split pad should be screwed in the same way.
After screwing the fixing set, screw the probe through 6 M4 screws (according to the DTR attached to the probe).